Note: "permalinks" may not be as permanent as we would like,
direct links of old sources may well be a few messages off.
Hi, On 05/18/2011 05:41 PM, Daniel Meszaros wrote: > 1. Make a side secondary. > 2. drbdadm/detach the secondary side. > 3. Stop DRBD on secondary side. > 4. Power down the switch, mount the GBICs, power up the switch. > 5. Start DRBD on the secondary side. > 6. drbdamd/attach the secondary side. > 7. Wait until both are in sync. > 8. Make both primary again. > > Can you confirm or tell me if I forgot a thing? This looks okay, but 1. use drbdadm up+down instead of attach+detach 2. no need to stop and start DRBD (i.e. unload/load the module) so long as the resources are in fact down (via drbdadm) Cheers, Felix