Note: "permalinks" may not be as permanent as we would like,
direct links of old sources may well be a few messages off.
Hi, I want to add some space. I have already upgraded the slave to have 900GB, while the master (and the actual storage) is 300GB. Master and slave are mirrored. Would it be a problem if I disconnect DRBD, make Slave primary, then do a resize2fs on Slave to match its 900GB, then upgrade Master to have 900GB as well? Or is it still safer to copy the data to a third server, then recreate the DRBD mirror from that? Thank you, Dimitri Volski -- This message has been scanned for viruses and dangerous content by Mail Call antivirus software, and is believed to be clean.