Note: "permalinks" may not be as permanent as we would like,
direct links of old sources may well be a few messages off.
On Mon, Apr 2, 2012 at 2:06 AM, Marcelo Pereira <marcelops at gmail.com> wrote: > Hello, > > I have been trying to sync two DRBD nodes, but it gets stalled at 100%. > > They are only 16Tb big. It has 6Tb of data to be sync'ed. How I know that?? > Well, I have never seen these nodes sync'ed, and I have transferred 6Tb of > data to the primary node, having the secondary node down. Now I just want to > sync. > > Well, the sync process forecasts 33h to go through, and I did sync two times > already, just to see it stalled at the very 100%. > > I know I'm using an old version (8.2.6), but I wonder why it's getting > stalled. The volumes are now umounted (unused) and sync'ing. I will wait > another 33h to check this out. Sync stalling at 100% is a known issue in 8.2.6 (several 8.2.x versions actually, iirc). Fixed in 8.3, so do upgrade. Florian -- Need help with High Availability? http://www.hastexo.com/now