Note: "permalinks" may not be as permanent as we would like,
direct links of old sources may well be a few messages off.
Hi say both nodes run version 8.x.y and I want to upgrade to 8.x.y+n (no major version change) Is it safe to A: primary B: secondary Disconnect Upgrade secondary node (B) Connect Let drbd sync Switchover the service (rolechange) Disconnect Upgrade secondary node (A) Connect Let drbd sync A: secondary B: primary ? And how about 8.0.x to 8.2.x ? Regards Dominik