<div dir="ltr">Hi,<div><br></div><div><br></div><div>I use DRBD ver 8.3.15 with Ahead/Behind mode.<br></div><div><br></div><div>While running on-line verify, the congestion is happen.</div><div>So, the connect status will be changed &quot;VerifyS/VerifyT&quot; to &quot;Ahead/Behind&quot;.</div>
<div>And the verify task will be abort. Verify task can not be completed.</div><div><br></div><div>Is this right?</div><div><br></div><div>And how can I finish the verify task ?</div><div><br></div><div>Regards,</div><div>
<br></div></div>